Planning Division
Development Map
Office
Return to Development Map
8100 Tower / Hampton Inn and Suites
|
|
|
Address:
|
5601 and 5501 American Blvd W
|
Assigned City Planner: Julie Farnham jfarnham@ci.bloomington.mn.us /
952-563-4739
|
|
Contact:
|
Ed Farr, Architect (952-943-9660)
|
Site size:
|
7.2 acres
|
|
Case file:
|
10825BCDE-09
|
Project size: 10-story, 257 room Hampton Inn hotel (phase I) and a
future 10-story, 255,000 sq. ft. office building (phase II)
|
|
Status:
|
approved 7/20/09 by the City Council
|
|
Other info:
|
Application
information
Elevation views
Site Plan
|
Last update:
|
9/2009
|
|
Project description: The applicant is proposing to construct a
10-story, 257 room Hampton Inn and Suites hotel and a future 10-story, 255,000
square foot office building in two phases. The hotel/office development will be
served by 1,198 structured and surface parking spaces, including 171
proof-of-parking spaces potentially available in future Level G of the shared
parking ramp. The existing two platted lots will be re-platted into a new lot for
the hotel and an outlot for the Phase II 8100 Tower.
The applicant is requesting a rezoning from C-4, Freeway Office District, to
C-4(PD), Freeway Office District Planned Development; a Preliminary Development
Plan for the Hampton Inn and Suites and the 8100 Tower; and a preliminary and final
plat.
|
Venture/BMG LLC (former Cattle Company Site)
|
|
|
Address:
|
4470 78th St. Circle West
|
Assigned City Planner: Julie Farnham jfarnham@ci.bloomington.mn.us /
952-563-4739
|
|
Contact:
|
|
Site size:
|
|
|
Case file:
|
7946AB-10
|
Project size: 2-story, 37,200 square foot office building
|
|
Status:
|
Planning Commission (public hearing) - Sept 2, 2010
City Council (anticipated) - Sept 13, 2010
|
|
Other info:
|
Application
information
|
Last update:
|
8/2010
|
|
Project description: A new 2-story, 37,200 square foot office
building is proposed on the site of the former Cattle Company restaurant. The
restaurant has been demolished, but the foundation remains in place. The new office
building and parking lot will be roughly in the same location as the previous
building and parking lot, although the new building will extend further east. The
adjacent lot to the north include 19 parking spaces that have, and will continue to
be used for shared parking with the Park Plaza hotel just north of the site.
The site has some environmental conditions that complicate development. These
include a high water table and a deep layer of peat. A Phase 1 environmental report
has been ordered. There may also be a wetland located west of the property. A
wetland delineation has been ordered.
Stormwater management will be challenging. The redeveloped site will provide a net
decrease in impervious surface. A rain garden is proposed to retain and treat
runoff.
Some deviations from Code development standards are proposed, including: building
setback from the rear lot line (the common lot line with the adjoining parcel); and
parking lot setback from the possible future right-of-way for W. 78th Street
Circle. In addition, the parking on the adjacent lot is needed to achieve the total
number of code required spaces. This is proposed to be shared parking.
|
Planning HOME |
Development Map |
Planning Commission |
Codes governing Bloomington
|