![]() |
![]() |
![]() |
|||||
|
|
|
|
|
|
|
|
|
|
Engineering sections: Public Works divisions: Related links: |
2012 Collector Street Program Open House
Materials presented were part of the 2012 Collector Street Program Open House that was held January 23, 2012 at the Public Works building. For each individual street segment you will find the layout that is proposed. An email link for each street section will allow you to send comments specifically for that street segment.
Policy Document
General Display Boards
Category I StreetsAuto Club Road and Normandale Boulevard - Louisiana Avenue to W 110th StreetNote: There are two options studied for these road segments. Option 1 would reconfigure both Auto Club Road and Normandale Boulevard to a 2-Lane roadway Option 2 would reconfigure Auto Club Road to be a 2-Lane roadway and would transition to a 3-Lane roadway along Normandale boulevard.
Poplar Bridge Road/W 94th StreetNote: This project is an extension of the existing 3-Lane roadway. The 3-Lane section will be extended to just east of intersection with Normandale Boulevard at that point it will transition back to 4-lanes. There will be bike lanes added to the intersection of Normandale and Poplar Bridge Road/W 94th Street.
For more information, contact:
Paul Jarvis
|